Management And Operational Problems Of Rural Water Supply In Nigeria (a Case Study Of Water Corporation Enugu)

ProjectStoc - 63 pages 3226 views Project Diploma/Degree/Masters Level Business Management ₦3500 Naira ($9.21 USD)

This is a Premium work, paid access only

Register/Login to Access Full Work

ABSTRACT

This research work is aimed at finding the courses of the organization and management problems of rural water supply programme in Nigeria, with a case study of Enugu State Water Corporation Enugu.
To guide this study thirteen (13) research questions were formulated and tested with percentages.  Based on the findings, some major findings include that the Enugu State Water Corporation have adequate materials for implementing their works and services. 
Consequently, it is found that organization and management problems of rural water supply in Nigeria, had adversely affected the functionality of the rural water supply.
Finally, it is found that the aim and objectives of rural water supply programme re not being achieved in Nigeria.
Based on the above finding, some major recommendations were made for effective implementations.
1.The management of Water Corporation Enugu should pay staff their monthly salaries/wages in order to encourage staff for effective work.
2.Management in assessing the candidate for recruitment should consider the qualification of the qualified once in order to avoid weak staff or incompetent once.
3.The aims of the organization will be achieved if the management participate effectively with the above paints.
 
TABLE OF CONTENTS
Title page
Approval page
Dedication
Acknowledgement
Abstract
Table of contents
List of tables

CHAPTER ONE
1.0 Introduction
1.1 Background of the study
1.2 Statement of the study 
1.3 Objective of the study
1.4 Research questions
1.5 Significance of the study
1.6 Scope of the study
1.7 Limitation of the study
1.8 Definition of terms
    References 

CHAPTER TWO:
2.0 Literature review
2.1 The nature of rural water supply in the rural community
2.2 Administration of Enugu State Water Corporation (ANSWC)
2.3 Management and organizational of (ANSWC)
2.4 Operational and maintenance support facilities
2.5 Problems and projects of (ANSWC)
2.6 Summary of the related literature
    Reference

CHAPTER THREE:
3.0 Research methodology
3.1 Design of the study
3.2 Area of the study
3.3 Population of the study
3.4 Sample and sample technique
3.5 Instrument of data collection
3.6 Validation of the instrument
3.7 Reliability of the instrument
3.8 Method of data administration and retrieval 
3.9 Method of data analysis

CHAPTER FOUR
4.1 DATA PRESENTATION, AND ANALYSIS
4.2 SUMMARY
4.3 CONCLUSION

CHAPTER FIVE:
5.0 Summary, recommendation and conclusion
5.1 Conclusion
5.2 Recommendations
5.3 Suggestion for further research
    Bibliography
    Appendix
    Questionnaires 
 

Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes

CITE THIS WORK

(2013, 04). Management And Operational Problems Of Rural Water Supply In Nigeria (a Case Study Of Water Corporation Enugu).. ProjectStoc.com. Retrieved 04, 2013, from https://projectstoc.com/read/1429/management-and-operational-problems-of-rural-water-supply-in-nigeria-a-case-study-of-water-corporation-enugu
"Management And Operational Problems Of Rural Water Supply In Nigeria (a Case Study Of Water Corporation Enugu)." ProjectStoc.com. 04 2013. 2013. 04 2013 <https://projectstoc.com/read/1429/management-and-operational-problems-of-rural-water-supply-in-nigeria-a-case-study-of-water-corporation-enugu>.
"Management And Operational Problems Of Rural Water Supply In Nigeria (a Case Study Of Water Corporation Enugu).." ProjectStoc.com. ProjectStoc.com, 04 2013. Web. 04 2013. <https://projectstoc.com/read/1429/management-and-operational-problems-of-rural-water-supply-in-nigeria-a-case-study-of-water-corporation-enugu>.
"Management And Operational Problems Of Rural Water Supply In Nigeria (a Case Study Of Water Corporation Enugu).." ProjectStoc.com. 04, 2013. Accessed 04, 2013. https://projectstoc.com/read/1429/management-and-operational-problems-of-rural-water-supply-in-nigeria-a-case-study-of-water-corporation-enugu.

Connect with Us