ABSTRACT
This write up is a detain of the process and formulation of plan for the physical realization of the construction of a mobile cooking system. It as divided into chapters, which discussed extensively the practical refrigerator cycle with attention given to constriction factors, working principle and choice of materials. The method used in the fabrication, assembly and arriving as knowing the safety requirement were not left out.
It is strongly believed by the authors that his will make an interesting study for inquisitive minds and collection of fact for future related project.
TABLE OF CONTENTS
Title page
Letter of transmittal
Release page
Signature page
Approval page
Dedication
Acknowledgement
Abstract
Table of contents
CHAPTER ONE
1.0 Introduction
CHAPTER TWO
2.0 Literature Review
CHAPTER THREE
3.0 Theory of Construction and Analysis
3.1 Component Pasts of the Refrigerator
3.2 Theory of Reversed Heal Engineering System Operating on A Cannot Cycle
3.3 Refrigerant
3.4 The Construction Standards and Component Determination
CHAPTER FOUR
4.0 Construction Procedures
4.1 Material Selection
4.2 Tools /Equipment Used
4.3 Construction Method and Procedure (Sequence of Operation
4.4 Laying of Evaporator Ripe (Piping
4.5 Lagging
4.6 Electrical System in the Fridge
4.7 Principles of Operation
CHAPTER FIVE
5.0 Testing and Evolution
CHAPTER SIX
Cost Analysis
6.0 Material Cost
6.2 Labour Cost Recommendation
References
Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes
CITE THIS WORK
(2013, 02). Construction Of A Mobile Refrigerator.. ProjectStoc.com. Retrieved 02, 2013, from https://projectstoc.com/read/917/construction-of-a-mobile-refrigerator
"Construction Of A Mobile Refrigerator." ProjectStoc.com. 02 2013. 2013. 02 2013 <https://projectstoc.com/read/917/construction-of-a-mobile-refrigerator>.
"Construction Of A Mobile Refrigerator.." ProjectStoc.com. ProjectStoc.com, 02 2013. Web. 02 2013. <https://projectstoc.com/read/917/construction-of-a-mobile-refrigerator>.
"Construction Of A Mobile Refrigerator.." ProjectStoc.com. 02, 2013. Accessed 02, 2013. https://projectstoc.com/read/917/construction-of-a-mobile-refrigerator.
- Related Works
- Gear Design And Types. (7d)
- Repair And Rehabilitation Of A Faulty Deep Freezer In The Mechanical Engineering Department
- A Termpaper On Types, Selection And Design Of Bearing
- Technical Report On The Fabrication Of A Fan Blade
- Advanced Fine Finishing Process
- Construction Of Industrial Wheel Barrow
- Plant Maintenance And Services
- Design And Fabrication Of A Dust Extractor
- Design And Implementation Of A Computerized Modern Poultry Farm A Case Study Imo Poultry Farm Ltd
- The Design Of A Modern Railway Station