INTRODUCTION
Background of Study
The statement on study auditing standards defined internal control as being not only internal check and internal audit but the whole system of controls, financial or otherwise, establishment by management in order to secure, as far as possible, the accuracy and reliability of the records run the business in an orderly manner and safeguard the company’s assets its objective being the prevention or early detection of fraud and errors.
One of the major factor believed to restrict efficient performance of most Nigeria public sector enterprise is un-serious approach towards accountability. There is a great need to establish internal checks and auditing system as well as defining a control of financial and management procedure so as to carry on the operations of the enterprise in a way as to guard against the possibility of not only fraudulent practices and financial necklessness but also enhance performance and public confidence the enterprises.
National electric power Authority (NEPA) is an important public enterprise in Nigeria established by decree No.24 of 1st April 1972, with the amalgamation of Electricity corporation of Nigeria (ECN) and Nigeria dams Authority (NDA). NEPA was empowered to maintain an efficient, co-ordinates and economic system of electricity supply to all the nooks and cranny of the nation.
It’s operations especially it’s financial management and control system has been subject of intense debate. This is as a result some unsatisfactory performance as evidenced by near darkness all the time.
There is need to look at the internal control system in NEPA and it’s operational performances in the area of efficiency
TABLE OF CONTENTS
Title page
Approved page
Acknowledgement
Proposal
Table of contents
Chapter one
Introduction
1.1 Background of study
1.2 Statement of problem
1.3 Purpose of study
1.4 Significant of study
1.5 Research question/hypothesis
1.6 Scope of study/limitations
Chapter two
Literature review
2.1 Introduction
2.2 Types of internal control
2.3 Internal control in specific areas of a commercial enterprise
2.4 Objective of internal control
2.5 Some important aspect of internal control system
2.6 Segregation of power or duties
2.7 Physical control over asset and records
2.8 Independent checks on performance
2.9 Limitation and assumption on the effectiveness of internal control
1.0 Control environment and control procedure
1.1 Internal control questionnaire
1.2 Functions of internal control questionnaire
1.3 Brief history of electricity industry in Nigeria
1.4 National electric power authority (NEPA)
Chapter three
Research methodology
3.1 Population of study
3.2 Sample design
3.3 Source of data
3.4 Research instruments
3.5 Method of data analysis
3.6 Problems encountered in data collection process
Chapter four
Data presentation and
4.1 Questionnaire distribution and take of return
4.2 Analysis of data
4.3 Personal (oral) interview
Chapter five
Summary of findings conclusion and recommendations
5.1 Summary of findings
5.2 Conclusion
5.3 Recommendations
Bibliography
Appendixes
Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes
CITE THIS WORK
(2014, 10). The Evaluation Of Internal Control System Of Nepa (a Case Study Of Enugu District).. ProjectStoc.com. Retrieved 10, 2014, from https://projectstoc.com/read/4036/the-evaluation-of-internal-control-system-of-nepa-a-case-study-of-enugu-district-3380
"The Evaluation Of Internal Control System Of Nepa (a Case Study Of Enugu District)." ProjectStoc.com. 10 2014. 2014. 10 2014 <https://projectstoc.com/read/4036/the-evaluation-of-internal-control-system-of-nepa-a-case-study-of-enugu-district-3380>.
"The Evaluation Of Internal Control System Of Nepa (a Case Study Of Enugu District).." ProjectStoc.com. ProjectStoc.com, 10 2014. Web. 10 2014. <https://projectstoc.com/read/4036/the-evaluation-of-internal-control-system-of-nepa-a-case-study-of-enugu-district-3380>.
"The Evaluation Of Internal Control System Of Nepa (a Case Study Of Enugu District).." ProjectStoc.com. 10, 2014. Accessed 10, 2014. https://projectstoc.com/read/4036/the-evaluation-of-internal-control-system-of-nepa-a-case-study-of-enugu-district-3380.
- Related Works
- The Effect Of Motivation On Workers’ Productivity: (a Case Study Of The Nigerian National Petroleum Corporation
- The Impact Of Manpower Development And Training In Efficient Management Of Parastatals (a Case Study Of National Electric Power Authority Enugu State)
- The Effect Of Manpower Training And Development On The Productivity On The Employees Of Niger State Polytechnic (zungeru)
- The Role Of Non-governmental Organization In Community Development (a Case Study Of Ngor Okpuala South L. G. A. In Imo State)
- The Role Of Human Resources In Developing Organisational Culture
- Financial Management In Medium Scale Enterprises (a Case Study Of Mr Biggs Enugu)
- Investing In Small Scale Business
- The Study Of Management Of Working Capital In Banking Industry (a Case Study Of United Bank For African Plc) Enugu.
- The Impact Of News Commentaries On Radio Listeners (a Case Study Of Federal Radio Corporation Of Nigeria Enugu)
- Contribution Of Small-scale Business To National Economic Growth And Development (a Case Study Of Selected Bakeries In Enugu Urban)
