Design And Construction Of A Mobile Refrigerator

ProjectStoc - 57 pages 5945 views Project Diploma/Degree/Masters Level Mechanical Engineering ₦5000 Naira ($13.16 USD)

This is a Premium work, paid access only

Register/Login to Access Full Work

ABSTRACT
This write up focuses attention on a detailed report and account on the process of construction and formulation of plan for the actual and physical realization of the construction of the project work captioned fabrication and construction of a mobile cooling system.  The report is therefore divided into chapters and each chapter discussed extensively such that an illiterate refrigerator mechanic who read and comprehends the report can easily carryout the construction of refrigerator under little guidance and supervision. 
Subsequently, the principles of influencing the operation of a cooling system, choice of materials, various methods used in the fabrication and recommendation for advancement were duely treated.
Therefore, as the cooling system composed of mechanical and electric all parts, a lot of effort were made to break and discuss the various stages and sequences of assembly.  Stating a quite number of safety rules which must be adhered strictly to by and intended person or persons, who may embark on the project in future to achieve a positive result.

Finally, this write up also encompasses the maintenance of any cooling system irrespective of the size and make without limiting it to only mobile refrigerator, with due consideration that we are in the modern age of refrigeration due to the gradual destruction of the ozone layer, so that any person who seized the opportunity of reading through the report can maintain such equipment no matter the size and complexity with ease and save himself from being overheated by the sun.

 
TABLE OF CONTENTS
Title page
Letter of transmittal
Approval page
Dedication
Acknowledgement
Abstract
Table of contents

CHAPTER ONE
1.0Introduction
1.1Purpose Of Construction
1.2Importance And Specification Of Project
1.3Scope And Limitations
1.4Statement Of Problems

CHAPTER TWO 
LITERATURE REVIEW
2.0The History Of Refrigeration
2.1The Reversed Cannot Cycle
2.2Condition At The Compressor Inlet
2.3Sub Cooling Of The Condensed Vapour
2.4Selection Of Material

CHAPTER THREE
3.0Construction Details
3.1General Safety Rule
3.2Construction Method And Procedure
3.3Laying Of Evaporator Pipe (Piping)
3.4Lagging
3.5Electrical System In The Fridge
3.6Description Of The Unit/Principle Of Operation

CHAPTER FOUR
4.0Construction Analysis
4.1Heat Leakages Through The Boundaries
4.2Refrigeration
4.3The Evaporator
4.4The Evaporator Capacity Size
4.5The Condenser
4.6The Capillary Tube Size
4.7Co-Efficient Of Performance

CHAPTER FIVE
Summary 
Recommendation
Conclusion
References

Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes

CITE THIS WORK

(2012, 09). Design And Construction Of A Mobile Refrigerator.. ProjectStoc.com. Retrieved 09, 2012, from https://projectstoc.com/read/34/design-and-construction-of-a-mobile-refrigerator
"Design And Construction Of A Mobile Refrigerator." ProjectStoc.com. 09 2012. 2012. 09 2012 <https://projectstoc.com/read/34/design-and-construction-of-a-mobile-refrigerator>.
"Design And Construction Of A Mobile Refrigerator.." ProjectStoc.com. ProjectStoc.com, 09 2012. Web. 09 2012. <https://projectstoc.com/read/34/design-and-construction-of-a-mobile-refrigerator>.
"Design And Construction Of A Mobile Refrigerator.." ProjectStoc.com. 09, 2012. Accessed 09, 2012. https://projectstoc.com/read/34/design-and-construction-of-a-mobile-refrigerator.

Connect with Us