ABSTRACT
As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually to every thing they do.
A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds without going through the point for manual operation. This project writing were organized in according way for easy understanding
TABLE OF CONTENT
Title page
Approval page
Acknowledgement
Abstract
Table of content
Table of figure
CHAPTER ONE
1.0Introduction
1.1Design objectives
1.2Significance of the project
1.3 The project report models relevant to the design
CHAPTER TWO
2.0Literature review
2.1System component analysis
2.2Theories and models relevant to the design
CHAPTER THREE
3.0System design
3.1Description of the system building blocks
3.2System specification and block diagram
3.3Description of overall operation of the system
3.4Complete circuit diagram of the system
CHAPTER FOUR
4.0Implementation testing and results
4.1Packaging of the system
CHAPTER FIVE
5.0Cost analysis
5.1Conclusions and recommendation/suggestion
For Further Implementation
References
Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes
CITE THIS WORK
(2013, 03). Construction Of Automatic Change Over With Generator Trip Off.. ProjectStoc.com. Retrieved 03, 2013, from https://projectstoc.com/read/1226/construction-of-automatic-change-over-with-generator-trip-off
"Construction Of Automatic Change Over With Generator Trip Off." ProjectStoc.com. 03 2013. 2013. 03 2013 <https://projectstoc.com/read/1226/construction-of-automatic-change-over-with-generator-trip-off>.
"Construction Of Automatic Change Over With Generator Trip Off.." ProjectStoc.com. ProjectStoc.com, 03 2013. Web. 03 2013. <https://projectstoc.com/read/1226/construction-of-automatic-change-over-with-generator-trip-off>.
"Construction Of Automatic Change Over With Generator Trip Off.." ProjectStoc.com. 03, 2013. Accessed 03, 2013. https://projectstoc.com/read/1226/construction-of-automatic-change-over-with-generator-trip-off.
- Related Works
- Home Control Switch Automation Using Gsm Communication
- The Design And Construction Of House Bell With Indicating Light
- Design And Construction Of 1000va Power Inverter System
- Construction Of Equipment For Deodorizing Kerosene
- Study Of Power System Under Transient Condition
- Design And Construction Of An Inverter Type Arc Welding Machine
- Construction Of A Microcontroller Based T-junction Traffic Light Controller
- Design And Implementation Of A Solar Power System
- Construction Of 500w12vinverter Charger
- Electrical Power Generating Systems Considering Renewable And Non-renewable Energy Sources Nigeria As A Case Study