ABSTRACT
As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types.
It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage cause no great damage. However, places like the business confers, industrials and cold rooms need almost 100% power supply, and also hospitals and usefully clinics need constant power supply.
TABLE OF CONTENT
Title Page
Certification
Dedication
Acknowledgement
Table of Content
CHAPTER ONE
1.0 Introduction
1.1 Background
1.2 Aims / Objectives
1.3 Scope of Limitation
1.4 Definition of Terms
CHAPTER TWO
2.0 Literature Review
2.1 The Power Transformer
2.2 The Relay
2.3 Switches
2.4 Capacitors
2.5 Diode
2.6 Indicator Lights (Light Limiting Diode)
2.7 Power Supply
2.8 Resistor
CHAPTER THREE
3.0 Circuit Diagram
3.1 Block Diagram
3.3 Contactor Wiring Diagram
3.4 Diagram of the Casing
CHAPTER FOUR
4.0 Testing and Evaluation
4.1 Testing
4.2 Evaluation
4.3 Trouble Shooting and Remedy
4.4 Maintainability
CHAPTER FIVE
5.0 Conclusion
5.1 Reference
Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes
CITE THIS WORK
(2013, 03). Construction Of Automatic Change Over Switch.. ProjectStoc.com. Retrieved 03, 2013, from https://projectstoc.com/read/1225/construction-of-automatic-change-over-switch
"Construction Of Automatic Change Over Switch." ProjectStoc.com. 03 2013. 2013. 03 2013 <https://projectstoc.com/read/1225/construction-of-automatic-change-over-switch>.
"Construction Of Automatic Change Over Switch.." ProjectStoc.com. ProjectStoc.com, 03 2013. Web. 03 2013. <https://projectstoc.com/read/1225/construction-of-automatic-change-over-switch>.
"Construction Of Automatic Change Over Switch.." ProjectStoc.com. 03, 2013. Accessed 03, 2013. https://projectstoc.com/read/1225/construction-of-automatic-change-over-switch.
- Related Works
- Assessment Of Electrical Energy Use Efficiency In Nigeria Food Industry
- Construction Of An Fm Transmitter
- Construction Of A Microcontroller Based T-junction Traffic Light Controller
- Design And Construction Of An Obstacle Detection System For The Visually Impaired
- Construction Of A 12v Battery Charger
- Digital Fan Regulator
- Design And Implementation Of Biometric Features Pre-processing
- Construction Of 150 Watts 162 Audio Loudspeaker
- Design And Construction Of Uninterruptable Power Supply
- Construction Of Power Amplifier