ABSTRACT
This research is a study of the problems of acquisition and replacement of plant and equipment in a manufacturing industry. It is aimed at examining the activities involved in the production process with a view to using it in determining whether or not resources were fully utilized. It is also aimed at discovering the bottlenecks and weakness in the operations of manufacturing firms using Anambra motor manufacturing company limited as a case study.
This study has five chapters, which were combined to bring out all the ideals for a comprehensive work.
Chapters one contains general ideas of the study. It introduced the study and laid the foundation for the other chapters that appear in the other parts of the study. It contains three hypothesis which were tested in chapter four for statistical significance.
Chapter two reviewed related literature on the evolution of capital goods and investment appraisal techniques to be used in capital budgeting.
However, chapter three is on the research methodology, population size, sample size and measuring instrument used in the study. To make the study possible, survey research method was used based on the sample size of fifty two respondents.
Questionnaires were used as the research instruments administered, data collected, analyzed and interpreted in chapter four.
Chapter five deals specifically with summary, conclusion and recommendation
TABLE OF CONTENT
Title Page i
Approval Page ii
Dedication iii
Acknowledgement iv
Abstract vi
Table of Content viii
CHAPTER ONE
1. O Introduction 1
1.1 Background of the Study 1
1.2 Statement of Problem 5
1.3 Objectives of the Study 6
1.4 Significance of the Study 8
1.5 Scope of the Study 9
1.6 Research Hypothesis 10
1.7 Definition of Terms 12
CHAPTER TWO
2.0 Review of Related Literature 13
2.1 Evolution of capital Goods 12
2.2 Replacement 16
2.3 The Concept of Capital Budgeting 19
2.4 Financing of Capital Assets 24
2.5 Foreign Exchange 27
2.6 Capacity Utilization of Machinery and Equipment 30
CHAPTER THREE
3.0 Research Design and Methodology 37
3.1 Sources of Data 37
3.2 Determination of Sample Size 39
CHAPTER FOUR
4.0 Presentation, Analysis and Interpretation of Data 45
4.1 Presentation and Analysis 45
CHAPTER FIVE
5.0 Summary of Findings Conclusion
and Recommendation 74
5.1 Summary of Findings 74
5.2 Conclusion 74
5.3 Recommendation 75
5.4 Limitation of the Study. 78
References 79
Appendix 81
Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes
CITE THIS WORK
(2014, 11). The Problems Of Acquisition And Replacement Of Plant And Equipment In A Manufacturing Industry A Case Study Of Anambra Motor Manufacturing Company Limited Enugu... ProjectStoc.com. Retrieved 11, 2014, from https://projectstoc.com/read/5051/the-problems-of-acquisition-and-replacement-of-plant-and-equipment-in-a-manufacturing-industry-a-case-study-of-anambra-motor-manufacturing-company-limited-enugu-1125
"The Problems Of Acquisition And Replacement Of Plant And Equipment In A Manufacturing Industry A Case Study Of Anambra Motor Manufacturing Company Limited Enugu.." ProjectStoc.com. 11 2014. 2014. 11 2014 <https://projectstoc.com/read/5051/the-problems-of-acquisition-and-replacement-of-plant-and-equipment-in-a-manufacturing-industry-a-case-study-of-anambra-motor-manufacturing-company-limited-enugu-1125>.
"The Problems Of Acquisition And Replacement Of Plant And Equipment In A Manufacturing Industry A Case Study Of Anambra Motor Manufacturing Company Limited Enugu..." ProjectStoc.com. ProjectStoc.com, 11 2014. Web. 11 2014. <https://projectstoc.com/read/5051/the-problems-of-acquisition-and-replacement-of-plant-and-equipment-in-a-manufacturing-industry-a-case-study-of-anambra-motor-manufacturing-company-limited-enugu-1125>.
"The Problems Of Acquisition And Replacement Of Plant And Equipment In A Manufacturing Industry A Case Study Of Anambra Motor Manufacturing Company Limited Enugu..." ProjectStoc.com. 11, 2014. Accessed 11, 2014. https://projectstoc.com/read/5051/the-problems-of-acquisition-and-replacement-of-plant-and-equipment-in-a-manufacturing-industry-a-case-study-of-anambra-motor-manufacturing-company-limited-enugu-1125.
- Related Works
- Organizational Structure And Its Effect On Workers Performance
- The Impact Of New Product Development On Sales Volume
- The Role Of Small Scale Enterprises In The Development Of Nigerian Economy
- Causes Of Failure Of Small-scale Industries In Nigeria ( A Case Study Of Enugu State )
- The Impact Of Monetary Incentive Scheme For The Performance Of Workers In An Organisation. First Bank Of Nigeria Plc, Enugu
- The Importance Of Ethics And Social Rasponsibilities Of Business Organisation ( A Case Study Of Nigerian Bottling Company Plc Enugu )
- An Assessment Of Privatization Policy Of Public Companies In Nigeria
- The Effect Of Outsourcing On Business Competitive Positioning In The Nigeria Business Environment (a Study Of Nigeria Breweries Enugu)
- The Impact Of Supervision Of Effective Bank Management (a Case Study Of Uba Plc, Main Branch, Station Road, Enugu)
- Cost Minimizeation Strategies In Manufacturing Companies. (a Case Study Of Lever Brother Nigeria Plc)