ABSTRACT
The utmost aim of this study is to clearly define the factors necessary for the design of an efficient production system with a medium scale industry as the case study. It is also hoped that in the course of the study definition will be given to the design of a production system as it is manifested practically in commerce and industry
Taking Limca bottling company Okeigwe as the case study it is aimed to find out if overall performance of production of the company is a direct consequence of the nature of system and the criteria for the selection of the system design and management
In carrying out this research obvious efforts were direct towards the following
1. Defining effective management procedures for operating efficient production system.
2. To find how an efficient production system can leas to the provision of abundant goods and service and create employment opportunities.
Due to the nature of the study only those on the management level of the study, only those on analysis of data obtained and findings the researcher was able to conclude that:
1. Effective management procedure will guarantee the operation of efficient production system
2. There exist a relationship between production
3. Efficient production system design can lead to provision of quality goods and service and also create employment opportunities
In concluding the work the researcher made the following recommendations:
i. The company should hold firm to active strategy in production
ii. Work study should be carried by the company
iii. The company has to source raw material locally
iv. They have to reduce their level of inventories
v. Try to expand the existing market of their products
It is the opinion of the researcher that if the above recommendation are looked into the company stands to gain more.
TABLE OF CONTENT
Title page
Approval page
Acknowledgement
Dedication
Abstract
Table of content
CHAPTER ONE
1.1 INTRODUCTION
1.2 Historical background
1.3 Statement of problem
1.4 Significance of study
1.5 Objective of the study
1.6 Research question
1.7 Scope of study
1.8 Limitation of study
1.9 Definition of terms
CHAPTER TWO
2.0 LITERATURE REVIEW
2.1 Scope of production management
2.2 Organization for business planning
2.3 Business planning under systems approach
2.4 Major steps in managerial planning
2.5 Identification of opportunities and threats
2.6 Implementation
2.7 Production system design
2.8 Facilities requirement
2.9 Impute acquisition
2.10 Production system review and evaluation
2.11 Employee performance appraisal
Reference
CHAPTER THREE
RESEARCH DESIGN AND METHODOLOGY
3.0 Introduction
3.1 Area of study
3.2 Population
3.3 Sample size determination
3.4 Instrument for data collection
3.5 Validation of the instrument
3.6 Reliability of the instrument
3.7 Method of data collection
3.8 Questionnaire distribution and retrieval
CHAPTER FOUR
4.1 DATA PRESENTATION AND ANALYSIS
4.2 Presentation of data and data analysis
4.3 Summary of finding
CHAPTER FIVE
5.1Discussion of finding
5.2 Conclusion
5.3Recommendation
5.4 suggestions for further studies
Reference
Bibliography
Questionnaire
Disclaimer: Note this academic material is intended as a guide for your academic research work. Do not copy word for word. Note: For Computer or Programming related works, some works might not contain source codes
CITE THIS WORK
(2014, 11). Analysis Of Production System Design And Management In The Soft Drink Industry (a Case Study Of Limca Bottling Plant Okigwe).. ProjectStoc.com. Retrieved 11, 2014, from https://projectstoc.com/read/4820/analysis-of-production-system-design-and-management-in-the-soft-drink-industry-a-case-study-of-limca-bottling-plant-okigwe-232
"Analysis Of Production System Design And Management In The Soft Drink Industry (a Case Study Of Limca Bottling Plant Okigwe)." ProjectStoc.com. 11 2014. 2014. 11 2014 <https://projectstoc.com/read/4820/analysis-of-production-system-design-and-management-in-the-soft-drink-industry-a-case-study-of-limca-bottling-plant-okigwe-232>.
"Analysis Of Production System Design And Management In The Soft Drink Industry (a Case Study Of Limca Bottling Plant Okigwe).." ProjectStoc.com. ProjectStoc.com, 11 2014. Web. 11 2014. <https://projectstoc.com/read/4820/analysis-of-production-system-design-and-management-in-the-soft-drink-industry-a-case-study-of-limca-bottling-plant-okigwe-232>.
"Analysis Of Production System Design And Management In The Soft Drink Industry (a Case Study Of Limca Bottling Plant Okigwe).." ProjectStoc.com. 11, 2014. Accessed 11, 2014. https://projectstoc.com/read/4820/analysis-of-production-system-design-and-management-in-the-soft-drink-industry-a-case-study-of-limca-bottling-plant-okigwe-232.
- Related Works
- The Significance Of Personnel Management In Business Organisation A Case Syudy Of Nigeria Breweries Plc 9th Mile Coner Enugu
- Management Of Crises In An Organization. (a Case Study Of Anammco Plc Emene Enugu)
- Problems Of Management Of Small Scale Industry (a Case Study Of Farmer In Udi Local Government Area Of Enugu State)
- The Role Of Trade Fair In Marketing Of Goods And Services (a Case Study Of Enugu Chamber Of Commerce)
- The Importance Of Ethics And Social Rasponsibilities Of Business Organisation ( A Case Study Of Nigerian Bottling Company Plc Enugu )
- The Impact Of Training And Development On Staff Efficiency In First Bank Nigeria Plc
- How Managers Motivate Their Workers. The Enugu State Transport Company “entraco” As Our Case Study.
- The Effect Of Communication Gap In The Achievement Of Organisational Goal. (a Case Study Of Nigeria Bottling Company Onitsha.)
- Effective Application Of Marketing Concept In Bank Service (a Case Study Of Commercial Bank In Enugu)
- An Evaluation Of The Impact Of Inflation On Financial Statement Of Selected Manufacturing Organization