ABSTRACT This project studies the comparative analysis of private and public road transport operations. A conscious effort is made to measure the impact of both means of transport, their efficiency an...
Premium 70 pages 10670 words Project Diploma/Degree/Masters Level
A program in a non-structured language usually consistsof sequentially ordered commands, or statements, usually one in each line. thelines are usually numbered or may have labels: this allows...
Premium 9 pages 915 words Paper All Levels
Walling materials play a vital role in the construction of buildings. the study run acomparative analysis between hydraform blocks and sandcrete blocks which areboth major compone...
Premium 58 pages 12208 words Project Diploma/Degree/Masters Level
variation order is a common phenomenon inconstruction projects. it involves an amendment of the original scope of a projectas in the contract. variation orders are caused from vari...
Free 49 pages 9106 words Project Diploma/Degree/Masters Level
this paper discusses themeaning of the terms expression of interest, invitation for bids and requestfor tenders. these terms are often used and hence a clear understanding of whatthey mean is ca...
Free 4 pages 1116 words Paper All Levels
this project entitled “rehabilitation of road” is aimed at investigating the causes of failure on the road linking federal secretariat, imt civil soil lab to industrial centre imt campus i...
Premium 108 pages 18866 words Project Diploma/Degree/Masters Level
ABSTRACT The work was an attempt to evolve a quicker and easier means of reaching high places and point safely in tall buildings and other high structures. This has no doubt saved consideration c...
Premium 49 pages 5308 words Project Diploma/Degree/Masters Level
The aim of this research work is to discover how maintenance of buildings and infrastructures can be effected, effectively to help increase the workers output thus increasing labour efficiency and inc...
Free 114 pages 19339 words Project Diploma/Degree/Masters Level
Construction projects are known to experience time delays due to various reasons. The aim of this study is to find out if the material management approach used on building projects has a relat...
Free 13 pages 3849 words Paper All Levels